Dorsal Fin Technical Description:
The Cherokee Dorsal Fin modification requires removal of the Piper fin fairing
P/N 63517-00 (Nixon Nose). The new dorsal fin fairing is installed in two
pieces. The forward fin section is riveted permanently to the fuselage. The
aft section is installed with screws and is removable for inspection and
maintenance.
The labor time for installation of the Cherokee Dorsal Fin is approximately three
hours. This time does not include paint. Painting may be accomplished off of
the airplane (before final riveting) or on the airplane (after final
riveting).
The Cherokee Dorsal Fin fairing smoothes the airflow over the
vertical fin and rudder to improve rudder control effectiveness. The dorsal
fin fairing adds beauty and makes the airplane appear to be a much newer and
more expensive model. A slight cruise speed advantage is gained.
To purchase and install this product you will need to
order the following:
Order the STC and Drawings if you already have the parts by
clicking here.
or
Order the
complete
kit including the STC and drawings from
Globe Fiberglass:
Parts Required:
Aft Fairing
(including 2 each "L" brackets) P/N 99619-00 (1 each)
Forward Fairing
(including 1 each "A" bracket) P/N 99621-00 (1 each)
Rivnuts P/N A8-75
(14 each)
Screws P/N AN526-R8
(14 each)
Rivets P/N AD-4-4
(as required)
STC & Drawings